- Teri will be out of town for 2 weeks in Sept. and again some in October.
- The beginning of my semester. I have 7 classes.
- Vin is adjusting to 4 days a week at Mother's Day Out and is transitioning to 1 nap a day. (God help us!)
- Vin is cutting a molar. Yes a molar, can you believe that the kid only has one tooth on the bottom but has 6 on top and more on the way.
- Priming and painting the entire new house, ceilings included.
- Making big purchase decisions like paint colors, lighting, sinks, faucets etc.
- Packing up the East Side house and moving to San Saba
Kitchen before & after demo and new drywall
Hall closet after the AC unit was moved into the attic.
Dining room ceiling after the electrician stepped in the wrong place!
Garage and Craft Studio after demo. New insulation and drywall will be finished in the next week.
2nd load of trash. We've already filled a industrial trash trailer once.
Jobs completed:
Foundation repairNew roof
Kitchen and utility enlargement demo
New drywall texture throughout
Electrical upgrades
Jobs remaining (keep in mind that Teri and I will not be doing any of this labor except the paint)
Repair AC closet and dining room ceiling
Replace, sand and stain hard wood floors throughout
Paint
Install kitchen
Install new toilets
Install lighting
Drywall, texture, paint garage and studio
Oh and I forgot to mention that in the midst of all of this, Teri got Lasik surgery yesteday! She just had her follow up appt. and everything looks great.
4 comments:
Oh my goodness. You people are crazier than us. I bet you are going to have a great house when it is all done.
Oh, it's going to be so beautiful!! I LOVE that you're totally re-doing the craft room. I hope to spend many creative hours in there!
Best wishes and all the Blessings I have!
You are *%^@#^! nutz!!
Tina
It's looking good. Image how it will be come Halloween! :)
Katherine
Post a Comment